
Original: $190.00
-65%$190.00
$66.50The Story
Raise your David 3 or Spring 2 loom off the floor by 30 cm (11-3/4") to adjust tie-ups. You will need a helper to install or remove the extensions.
Description
Raise your David 3 or Spring 2 loom off the floor by 30 cm (11-3/4") to adjust tie-ups. You will need a helper to install or remove the extensions.














